We just finished up the 8th week of construction and the sub decks are complete and ready for Sundek, which is the textured concrete overlay on the decking that has great perks, such as, easy to maintain, slip resistant, cooler on the feet, and I love the way it feels! On the sub decks, they added more re-bar...
Protected the flagstone from over-spray...
Added the micro drain, which is covered by the tarp...
Another pic of re-bar...
Then, the concrete was poured...
Below is a pic of the side extension of the main deck...
Next up, is a pic of the lower deck...
The picture below is part of the front extension of the main deck...
Main deck extension and upper deck...
Upper deck...
Lower deck and side deck extension....
I'm very eager to get the pool finished... It's beautiful, amazing, and just keeps getting better after each phase is done. We have about 2 or 3 more weeks....